Projects

Dammam Pharma Plant – Khobar

Projects Dammam Pharma Plant – Khobar The Project scope involved full  engineering design, procurement  & construction of a 9,000 m² oral solids pharmaceutical manufacturing  facility at Dammam. The facility  consists of cleanroom manufacturing  areas, technical (MEP. Equipment)  floor, administration block, high bay goods warehouse and ancillary  buildings (Energy Centre, Switch  Rooms, Security Rooms) Location Dammam,…

BAE Training Facility – Riyadh

Projects BAE Training Facility – Riyadh Design & Build of a permanent corporate training facility built for BAE System, such as office space, innovative break out areas, 72 classrooms, 22 workshop halls, 8 labs. Works consists Civil, Structural, Architectural, Mechanical, Plumbing, Electrical, Signage, & Furniture Location Riyadh Consultant Absal Paul D&B Contract Duration 20 Months…

SATS Main Cargo & Transit Terminal

Projects SATS Main Cargo & Transit Terminal New Construction of SATS  Main Cargo & Transit Cargo Handling 28,000m²  facility  at King Fahad international Airport Dammam for SATS Saudi Arabia. Consisting of reinforce concrete floor slab / Raft foundation / insulate cladded steel superstructure / all MEP services including fire protection / sundry offices Location Dammam…

Saudi International Petrol Chemical Company (SIPCHEM)

Projects Saudi International Petrol Chemical Company (SIPCHEM) This project entailed the full construction  and commissioning of a high  specification research and development  facility for Sipchem, incorporating  research laboratories, offices,  auditorium, manufacturing area and  recreation spaces. The scope included  full MEP design and construction, all internal works & finishes, external  finishing and final landscaping works. Location…

TAQA Innovation Centre

Projects TAQA Innovation Centre A comprehensive turnkey project involving the new construction of a state-of-the-art R&D facility. The scope encompasses all Civil, Structural, and Architectural works, alongside high-specification MEP (Mechanical, Electrical, and Plumbing) systems. The delivery also includes integrated Signage, Hard & Soft Landscaping, and the complete Supply and Installation of Furniture (FF&E) to ensure…

Agility Bahrain Warehouse

Projects Agility Bahrain Warehouse The project consists of  Design and Build of new industrial warehouse with cold room, freezers and dry store areas within Bahrain Logistic Zone Location BLZ, Bahrain Consultant Ismail Khonji Associates (IKA) Contract Duration 12 Months Floor Area 16,000m²

NESR R & D Centre

Projects NESR R & D Centre New construction of Research & Development centre for National Petroleum Corporation at Dharan Techno Valley. The project consists of  Civil, Structural, Architectural, Mechanical, Electrical, Plumbing, Signage, Landscape and Supply & Installation of Furniture Location Dhahran Techno Valley, Dhahran Consultant Traiq Al Haj Contract Duration 15 Months Floor Area 4,500m²

BAE Training Facility – Jeddah

Projects BAE Training Facility – Jeddah Design & Build of a permanent corporate training facility built for BAE System, such as office space, innovative break out areas, classrooms, workshop halls, labs. Works consists, Civil, Structural, Architectural, Mechanical, Plumbing, Electrical, Signage. Location Jeddah Consultant Absal Paul D&B Contract Duration 12 Months Floor Area 8,500m²

B&B Logistic Facility Bahrain

Projects B&B Logistic Facility Bahrain Construction of a high specification bonded logistics facility consisting of temperature controlled, chilled and frozen storage areas, good receipt area with dock levelers and rapid action doors. Also provided are modern offices, customs and security facilities, external paved area all within Bahrain Logistic Zone Location BLZ Hidd, Bahrain Consultant Elevation…

Halliburton SAIHAT – Qatif

Projects Halliburton SAIHAT – Qatif New development within the existing Halliburton Saihat Base. The project consisted of 343 bedroom personnel accommodation in two large residential blocks with recreation and dining facilities. The scope of works includes centralized MEP area, warehousing, workshops, perimeter blast wall and associated external works of 15,000 m² Location Saihat, Qatif Consultant…

Nabors Yard Phase 1

Projects Nabors Yard Phase 1 Phase 1 of a new Saudi Arabian headquarters facility for Nabors Arabia Ltd. The facility located 60km from Dammam on the Riyadh Highway consist of all buildings, infrastructure and facilities required to support Nabors in their oil drilling activities across the Kingdom. Phase 1 scope of works included Training Centre…

Sharbathly Cold Storage Facility

Projects Sharbathly Cold Storage Facility The project involved the construction of a 6,000 m2 extension to the existing MASCO facility in Dammam. To ensure structural integrity, the project featured stone pile ground improvement across the entire footprint of the structure. A key technical highlight included the installation of DM2 rated steel fiber reinforced concrete floors,…

TNT Airport Cargo Facility

Projects TNT Airport Cargo Facility This new TNT Express facility based at Dammam’s King Fahd International Airport will increase the size of TNT’s current sorting and customs clearance space in Dammam Airport. At completion, the facility will provide 5,200m² of sorting and customs clearance space within a 10,000m² plot with air and landside access Location…

Honeywell Warehouse​

Projects Honeywell Warehouse​ The project involved complete remodeling renovation of a non descript warehouse  building to incorporate  a specialist  test facility for oil refinery control panels.  The scope was full design, construction, commissioning of a specialist  electrical installation, HVAC and mezzanine offices . Location Dammam Consultant EC Harris & AECOM Contract Duration 06 Months​ Floor…

SATS Start-Up Cargo Terminal ​

Projects SATS Start-Up Cargo Terminal ​ The project comprised the construction of a 4,500 m2 logistics hub at King Fahd International Airport in Dammam. The structure was engineered using a reinforced concrete raft foundation and floor slab, supporting a sophisticated insulated cladded steel superstructure. This comprehensive delivery included all essential MEP services, with a specialized…

Nabisco Storage Facility Expansion​

Projects Nabisco Storage Facility Expansion​ This expansion project involved the integration of a new high-capacity bakery production line and significant infrastructure upgrades to the existing Nabisco Arabia facility. The scope encompassed the full construction lifecycle, beginning with strategic demolition and moving into heavy structural works. Absal Paul delivered comprehensive MEP (Mechanical, Electrical, and Plumbing) services,…

PIF Tower – Head Office Fit-Out

Projects PIF Tower – Head Office Fit-Out The Scope of Works is for the completion of the interior Fit-Out works to 18 floors and the relevant areas of basement LB1 of the “PIF Tower”, Parcel 1.16, at the KAFD. Works including, Demolition works, Temporary offices, (Architectural, Mechanical, Electrical, Plumbing, Supply, and installation of Furnitures, Testing…

Riyad Bank Bronze Tower Office Fit-Out

Projects Riyad Bank Bronze Tower Office Fit-Out The Scope of Works is for the completion of the interior Fit-Out works to 44 Floors  of “Riyad Bank Tower”, Parcel 1.14, at the King Abdullah Financial District. Works include Fit-Out of new offices including,  Remedial Works, Demolition works, Temporary offices, (Architectural, Mechanical, Electrical, Plumbing, Supply, and installation…

SAMA HQ 01 Office Fit-Out

Projects SAMA HQ 01 Office Fit-Out The Scope of Works is for  SAMA  HQ 1 project consists of 6 existing interior floors above grade and 2 basement floors complete with a large  6 story central landscaped atrium which will be demolished and re-fitted with new interiors including Architectural, MEP & FFE. The project will be…

SRMG HQ Office Fit-Out

Projects SRMG HQ Office Fit-Out The Scope of Works is for the complete Design & Build services of the SRMG New Corporate HQ office for a floor space of 8,500m² square meters across 4 floors in Parcel 4.11, at the King Abdullah Financial District, Riyadh Works include design and build of new offices &  Broadcasting…

SPPC HQ Office

Projects SPPC HQ Office The project consist of the high-end  Fit-Out  works of 12,900 m² of office space  SPPC Saudi Arabia . The fast-track  Fit-Out involves, Architectural,  MEP and Partitions, finishes to Reception area and the Fitted furniture and  Fittings. Location P 3.10, KAFD, Riyadh Consultant FBS Saudi Contract Duration 8 Months Floor Area 12,900m²

BANK ABC HQ Office Fit-Out 

Projects BANK ABC HQ Office Fit-Out External Works: Demolition, Supply and installation of new floor finishes, landscaping, irrigation, planter boxes and light fittings. Tower 1 (10 Floors): Demolition, Supply and installation of new façade and complete Fit-Out including mechanical and electrical works. Tower 2 (4 Floors): Demolition, Supply and installation of complete fit out including…

Lockheed Martin Office

Projects Lockheed Martin Office The project consist of the high-end  Fit-Out of 3,500 m² of office space  for Lockheed Martin, Saudi Arabia . The fast-track  Fit-Out involves, Architectural,  MEP and Partitions, Finishes to Reception area and the Fitted Furniture and  Fittings. Location Business Gate, Riyadh Consultant Absal Paul D&B Contract Duration 09 Months Floor Area…

DNEC HQ Office

Projects DNEC HQ Office The project consist of the high-end  Fit-Out  works of 6,000 m² of office space  DNEC Saudi Arabia . The fast-track  Fit-Out involves, Architectural,  MEP and Partitions, finishes to Reception area and the Fitted furniture and  Fittings. Location P 2.12, KAFD, Riyadh Consultant FBS Saudi Contract Duration 7 Months Floor Area 6,000m²

PWC Varies Office Fit-Out 

Projects PWC Varies Office Fit-Out The project consist of the high-end  Fit-Out of 9,500 m² of office spaces  for Pricewaterhouse Coopers  varies offices in KAFD & Kingdom Center. The fast-track  Fit-Out works include design and build of new offices, (Architectural, Mechanical, Electrical, Plumbing, AV & IT, Supply and installation of Furnitures, Location KAFD P4.14, Riyadh…

Qiddiya Office

Projects Qiddiya Office The project consist of the high-end  Fit-Out of 3,000 m² of office space  for Qiddiya Investment Company. The fast-track  Fit-Out involves, Architectural,  MEP and Partitions, Finishes and the Fitted Furniture &  Fittings. Location ITCC Building, Riyadh Consultant Absal Paul D&B Contract Duration 05 Months Floor Area 3,000m²

KKIA Terminal 5 – SSP Retail Outlets

Projects KKIA Terminal 5 – SSP Retail Outlets High Procurement, Supply and installation  of Interior Fit-Out works for various  commercial Outlets (Café Ritazza, Camdon Food & Upper Crust) in Level 1 of Terminal 5, King Khalid International Airport, Riyadh. The works comprises, architectural MEP works  and FF&E Location KKIA T5, Riyadh Consultant A&M Associates Contract…

ZKLF Office Fit-Out

Projects ZKLF Office Fit-Out A high-quality, turnkey fit-out project for the new ZKLF office, covering a total area of approximately 2,800m². The scope of work comprises design development and procurement, as well as the supply and installation of electrical, security, CCTV, and mechanical systems, including furniture and fittings. Location Olaya Tower, Riyadh Consultant Bluehaus Group…

AWS Arcapita Office Fit-Out

Projects AWS Arcapita Office Fit-Out New Office high-end fit-out for a Global IT Company, over 1,100m² of space including reception, consultancy & sales areas including all MEP services (AV, IT, power and mechanical). Also includes all furniture and kitchenette service areas. Location LA & Bluehaus Consultant Absal Paul D&B Contract Duration 04 Months Floor Area…

Citibank Office Fit-Out

Projects Citibank Office Fit-Out The project consist of the high-end  Fit-Out of 1,800 m² of office spaces  for Citibank @ Level 20, Kingdom Center. The fast-track  Fit-Out Works include design and build of new offices, (Architectural, Mechanical, Electrical, Plumbing, AV & IT, Supply and installation of Furnitures, Location Kingdom Tower, Riyadh Consultant Absal Paul D&B…

AFG HQ Office Fit-Out 

Projects AFG HQ Office Fit-Out The project consist  of the high-end Fit-Out of 11,000m² of office  space covering 3 building  for the Al Faisaliah Group. The fast-track Fit-Out involves  the full MEP installation, partitions, finishes to toilet area  and the fitted furniture  and fittings Location Business Gate, Riyadh Consultant Bluehaus Group Contract Duration 08 Months…

Boeing Head Office Fit-Out 

Projects Boeing Head Office Fit-Out The project consist of high quality design & build fit-out project for Boeing New  Head offices for 3000m² over 3 floors. The work comprised of the design, procurement, architectural,  show supply and fix of electrical, security, CCTV, IT equipment’s, mechanical, furniture and fitting. Location Business Gate, Riyadh Consultant Bluehaus Group…

Dussur Head Office Fit-Out 

Projects Dussur Head Office Fit-Out The project consists of a high-end, turnkey design and build fit-out for the SAIIC head offices. The scope of work comprises design, procurement, and architectural services, as well as the supply and installation of electrical systems, security and CCTV, IT equipment, mechanical systems, and furniture and fittings. Location Business Gate,…

KACWA Retail Store Fit-Out

Projects KACWA Retail Store Fit-Out Construction and high-end retail fit-out for the King Abdulaziz Center for World Culture (KACWA), transitioning the space from ‘Grey Box’ to completion. The scope of work included design development and the procurement of all MEP systems, high-end finishes, furniture, and artwork. Location KACWA, Dhahran, KSA Consultant Doyle + Associates Contract…

Four Seasons Hotel

Projects Four Seasons Hotel Appointed as a main contractor for the complete renovation works of Four Season Hotel 274 rooms in Kingdom Tower. The project consists Architectural, MEP, Joinery and installation of FF&E and OSE packages.​ Location Riyadh, KSA​ Consultant HBA Design Contract Duration 12 Months Floor Area 28,000m²​

Damac Tower Apartments Fit-Out

Projects Damac Tower Apartments Fit-Out Appointed as the Main Contractor for the shell and core fit-out of Paramount Hotel Apartments (Tower B). The scope includes the full supply and installation of FF&E across 34 floors, comprising a total of 240 luxury apartments. Location Riyadh, KSA Consultant MME Contract Duration 15 Months Floor Area 25,500m²

Rocco Forte Hotel Fit-Out

Projects Rocco Forte Hotel Fit-Out Fitting out of prime suites, including the supply and installation of Furniture, Fixtures, and Equipment (FF&E) for 311 rooms. The scope of work comprised the design of bespoke furniture, lighting, drapery, carpets, custom decorative pieces, artwork, and interior landscaping. Location Jeddah, KSA Consultant Martin Brudzinski Contract Duration 12 Months Floor…

Shangri La Hotel Fit-Out

Projects Shangri La Hotel Fit-Out The project consists of 192 keys—comprising 132 Standard rooms, 5 ADA-compliant rooms, 53 Corner Suites, and 2 signature suites (Royal and Executive)—along with public areas located at the SAIL Tower in Jeddah, KSA. The public spaces include the Hotel Lounge, Business Centre, Reception, Meeting Rooms, and Prayer Rooms, as well…

Bahrain Airport VIP Lounge Fit-Out 

Projects Bahrain Airport VIP Lounge Fit-Out The project involved the high-end, fast-track fit-out of a 4,000 m² VIP Passenger Lounge at Bahrain International Airport. As a design and build contract, the scope encompassed comprehensive architectural, MEP (Mechanical, Electrical, and Plumbing), AV, and IT systems, along with the supply and installation of bespoke furniture. Location Bahrain…

DDC Monolith Hotel Mock-up Room

Projects DDC Monolith Hotel Mock-up Room A comprehensive Design & Build fit-out works for the DDC AlUla Monolith Hotel Room Mockups. The project scope encompassed structural, architectural, MEP, and landscaping works, along with the design and integration of FF&E. This included bespoke furniture, custom lighting, soft furnishings, curated artwork, and interior landscaping. Location Project W,…

Conrad Residence Hotel Fit-Out

Projects Conrad Residence Hotel Fit-Out Scope of work includes the interior fit-out of hotel guestrooms, corridors, restaurants, meeting rooms, and reception areas. Additionally, we managed the supply and installation of loose furniture, lighting, carpets, and OSE items for all 98 units, including standard apartments and two premium penthouses. Location Manama, Bahrain Consultant LW & PAD…

DGCL Wadi Safar Hotels Mock-up Room

Projects DGCL Wadi Safar Hotels Mock-up Room Complete Design & Build fit-out of the guestroom mockups for the Wadi Safar hotel cluster, featuring The Chedi, Faena, Oberoi, and Six Senses. The project encompassed full structural, architectural, MEP, and landscaping works. The scope also included the bespoke design and delivery of FF&E, featuring custom furniture, lighting,…

Red Sea Global (RSG) Office

Projects Red Sea Global (RSG) Office The project consist of Supply and installation of high end loose furniture and carpets for Typical Office Floors,  Chief Offices, Executive Areas including Management Offices. Location Tadawul Tower, Riyadh Consultant Absal Paul D&B Contract Duration 06 Months Floor Area 20,000m²

Habitas Al Ula Hotel Rectification Works

Projects Habitas Al Ula Hotel Rectification Works Appointed as the main contractor for specialized works at the Habitas AlUla. The scope involves the supply and installation of a stretched fabric shading system for 96 villas, along with the integration of an outdoor mist-fogging system. Location Al Ula, KSA Consultant Absal Paul Contract Duration 8 Months…

BAH054 Data Centre (25w) Bahrain

Projects BAH054 Data Centre (25w) Bahrain The project Fast track construction of a high capacity Data Centre for a confidential Client at Zallaq, Bahrain. Project consist of bored concrete piles, structural steel frame, all MEP Systems (MV, LV, UPS Generators, Chilled Water Systems, BMS, EPMS & Fire Protection) and integration, commissioning and validation of all…

DXB061 Data Centre (32w) UAE

Projects DXB061 Data Centre (32w) UAE The project Fast track construction of a high capacity Data Centre for a confidential Client at Abu Dhabi. Project consist of bored concrete piles, structural steel frame, all MEP Systems (MV, LV, UPS Generators, Chilled Water Systems, BMS, EPMS & Fire Protection) and integration, commissioning and validation of all…